|
|
|
 |
To download the Reference list please click here. |
|
References
|
03/02/2012
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Creative solutions from Schöck at new University Design Centre. |
|
|
03/02/2012
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck and Waterman meet structural challenges at NEO Bankside. |
|
|
03/02/2012
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck lends itself perfectly to Canada Water Library. |
|
|
27/08/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
The Schöck Isokorb® thermal break module type KS, for concrete-to-steel connectivity,... |
|
|
27/08/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Winner of the MIPM 2010 award for Hotels and Tourism, which is presented for outstand... |
|
|
25/08/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
The balconies of the Athena Building are designed as a combination of curved and ... |
|
|
22/04/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
The full height brise soleil to the buildings frontage is a major feature of the new ... |
|
|
20/04/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck Isokorb® installed at landmark Hemisphere project. |
|
|
14/04/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck thermal break solution for new Burlington Danes Academy. |
|
|
06/04/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck thermal break modules for ss Great Britain redevelopment scheme. |
|
|
11/03/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck thermal breaks show their all-round ability at new rotunda building. |
|
|
11/03/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck Isokorb® installed at Wallace and Gromit`s new home. |
|
|
11/03/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck thermal break units used to isolate external concrete banding. |
|
|
11/03/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Schöck Isokorb® proves its fitness at new Esporta Health Club. |
|
|
11/03/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Versatile modular balcony connectivity for Grade II listed building. |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-concrete connection of cantilever elements, transfers b... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-steel connection of cantiliver elements, transfers bend... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for steel-to-steel connection of cantilever elements, transfers tension... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for steel-to-steel connection of cantilever elements, transfers tension... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for steel-to-steel connection of cantilever elements, transfers tension... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-concrete connection of cantilever elements, transfers b... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for steel-to-steel connection of cantilever elements, transfers tension... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for steel-to-steel and concrete-to-steel connection of cantilever eleme... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-steel connection of cantiliver elements, transfers bend... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-concrete connection of cantilever elements, transfers b... |
|
|
27/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
Reinforcement of high quality aesthetic pre-cast concrete wall units for a 3.2 km lon... |
|
|
27/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-concrete connection of cantilever elements, transfers b... |
|
|
26/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for concrete-to-concrete connection of cantilever elements, transfers p... |
|
|
22/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for steel-to-steel connection of cantilever elements, transfers tension... |
|
|
22/01/2010
|
|
Products: |
Schöck Isokorb® |
|
|
Task: |
Thermal break for the connection of concrete-to-concrete elements, transfers shear fo... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
Steel-free, non-corrosive and durable reinforcement in the bridge parapet walls of t... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
We received the contract for this exciting project a couple of weeks ago. The comple... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
A research centre of a special kind - the unique "Mike and Ophelia Lazaridis Quantum... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
For this bridge rehabilitation project we have delivered ComBAR® bars as well as ben... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
Replacement of the carriageway slab within the range of the electronic vehicle detec... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
Tunnel: Launch Shaft Head Walls
Contiguous Caisson Wall, 2 softeyes, 3 reinforce... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
PL-2 parapets according to MTO Standard SS110-90 |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
PL-2 parapets according to MTO Standard SS110-90 |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
Tunnel: Launch Shaft Head Walls
Contiguous Caisson Wall, 2 softeyes... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
In connection with the modernisation of the shopping centre the existing load distri... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
PL-2 barrier rehabiliation. ComBAR diagonal straight dowels instead of L-shaped bent... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
The barrier walls at the Walker Road Overpass were originally designed using stainle... |
|
|
20/01/2010
|
|
Products: |
Schöck ComBAR® |
|
|
Task: |
This project is to be especially highlighted as these are the first approach slabs t... |
|
|
|
YOUR CONTACT
Schöck Ltd The Clock Tower 2 - 4 High Street Kidlington Oxford OX5 2DH
Tel: 0845 241 3390
Fax: 0845 241 3391 |
|
design@schoeck.co.uk |
|