Replacement of the carriageway slab within the range of the electronic vehicle detection. Reinforcement out of steel would have led to impairments of the operation of the detection system.
Tain (France)
Schöck LtdThe Clock Tower2 - 4 High StreetKidlingtonOxfordOX5 2DHTel: 0845 241 3390Fax: 0845 241 3391 design@schoeck.co.uk